MODOT Construction Week of August 2nd

Nodaway County

Route 46 – Pothole patching from Icon Road to Route 113, Aug. 2 – 6

Route A – Bridge maintenance at the Nodaway River Bridge, Aug. 2 – 6. This is an around-the-clock lane closure with temporary traffic signals. A 10-foot width restriction is in place.

Routes AF and V – Pothole patching, Aug. 2 – 6

Route TT – Culvert repair, Aug. 3. The road will be narrowed to one lane with flaggers directing motorists through the work zone.

Route 46 – Pothole patching from Route 113 to Route EE (Atchison County), Aug. 3 – 4

Andrew County

Interstate 229 – Resurfacing project from I-29, north of St. Joseph, to Route 371 (mile marker 14 to 3) through mid-September. A 10-foot width restriction is in place.

I-29 – Bridge replacement project northbound over Hopkins Creek (mile marker 58) through October. Traffic is head-to-head in the southbound lanes. *Focus on Bridges project

Atchison County

I-29 – Bridge replacement project over Nishnabotna River (mile marker 122 – 124) through September 2022. Traffic is head-to-head in the southbound lanes. More info: https://www.modot.org/atchison-county-interstate-29-nishnabotna-river-bridge-rehabilitation *Focus on Bridges project

Route 111 – Resurfacing project from Route E to Route 111 Spur (Holt County) through August. This included intermittent CLOSURES for pavement repairs. More info: https://www.modot.org/atchison-and-holt-county-flood-damage-repairs

Route BB – CLOSED for a resurfacing project through August. More info: https://www.modot.org/atchison-and-holt-county-flood-damage-repairs

Route TT – Resurfacing project through August. This includes intermittent CLOSURES for pavement repairs. More info: https://www.modot.org/atchison-and-holt-county-flood-damage-repairs

Route A – Resurfacing project through August. This includes intermittent CLOSURES for pavement repairs. More info: https://www.modot.org/atchison-and-holt-county-flood-damage-repairs

Route D – Resurfacing project through August. This includes intermittent CLOSURES for pavement repairs. More info: https://www.modot.org/atchison-and-holt-county-flood-damage-repairs

Route Z – Resurfacing project through mid-August. This includes intermittent CLOSURES for pavement repairs. More info: https://www.modot.org/atchison-and-holt-county-flood-damage-repairs

Route V – Resurfacing project through August. This includes intermittent CLOSURES for pavement repairs. More info: https://www.modot.org/atchison-and-holt-county-flood-damage-repairs

Route U – Resurfacing project through mid-August. This includes intermittent CLOSURES for pavement repairs. More info: https://www.modot.org/atchison-and-holt-county-flood-damage-repairs

Route W– Resurfacing project through mid-August. This includes intermittent CLOSURES for pavement repairs. More info: https://www.modot.org/atchison-and-holt-county-flood-damage-repairs

I-29 – Pothole patching from Route A/B (mile marker 116) to Route W (mile marker 99, Holt County), Aug. 2 – 6

Route J – Pothole patching from U.S. Route 59 to U.S. Route 136, Aug. 3

Route 46 – Pothole patching from Route 113 (Nodaway County) to Route EE, Aug. 3 – 4

Gentry County

U.S. Route 169 – CLOSED for a bridge deck replacement project over Middle Fork of the Grand River, near Gentry, through August. More info: https://www.modot.org/route-169-and-route-ee-bridge-deck-replacement *Focus on Bridges project

Route N – CLOSED for a culvert replacement from U.S. Route 136 to East 315th Street, Aug. 4, 7 a.m. to 4 p.m.

Route Z – CLOSED for a culvert replacement from Route H/A at Berlin to County Road 570, Aug. 4, 8 a.m. to 3 p.m.

Holt County

Route 111 – Resurfacing project from Route 111 Spur to Route E (Atchison County) through August. This includes intermittent CLOSURES for pavement repairs. More info: https://www.modot.org/atchison-and-holt-county-flood-damage-repairs

I-29 – Pothole patching from Route A/B (mile marker 116, Atchison County) to Route W (mile marker 99), Aug. 2 – 6

U.S. Route 159 – Bridge approach work at the Little Tarkio Bridge, east of Route P, Aug. 4

Worth County

Route M – CLOSED for a culvert replacement from U.S. Route 169 to Poplar Avenue, Aug. 2, 7 a.m. to 4 p.m.

Route B – CLOSED for a culvert replacement from Route W to East 190th Road, Aug. 5, 7 a.m. to 4 p.m.