MODOT Construction Week Of August 24th

Nodaway County

Route 46 – CLOSED for a bridge replacement project at the White Cloud Creek Bridge, east of Route AB, and Stream and Florida Creek bridges, west of Route AB. The project to replace all four bridges is expected to continue through early December. These bridges are included in Gov. Mike Parson’s $351 million Focus on Bridges program, which will repair or replace 250 bridges across the state. More info: https://www.modot.org/route-46-bridge-projects-west-maryville

Route C – Driveway tube replacement south of Route KK in Elmo, Aug. 24

U.S. Route 71 – Culvert repair northbound 1.5 miles south of Maryville in the driving lane (right lane), Aug. 24 – 27. The passing lane (left lane) will be open to traffic with a 14-foot width restriction.

Routes AF and NN – Pothole patching, Aug. 24 – 28

Route AD – CLOSED for shoulder work from 130th Street to 140th Street, Aug. 25, 6:30 a.m. to 2 p.m.

Route C – Pothole patching from U.S. Route 71 to Westboro, Aug. 26

U.S. Route 136 – Pothole patching from Route PP to Burlington Junction, Aug. 27

Andrew County

Interstate 29 – Bridge replacement project over Hopkins Creek and bridge rehabilitation project over Route T (mile marker 58-60) through January 2021. A 14-foot width restriction is in place. These bridges are included in Gov. Mike Parson’s $351 million Focus on Bridges program, which will repair or replace 250 bridges across the state.

I-29 – Concrete replacement northbound at mile marker 62.2, north of Route K, Aug. 24 – 25

U.S. Route 59 – Concrete replacement at U.S. Route 71, Aug. 25

Atchison County

U.S. Route 136 – Drainage work in Rock Port, two blocks west of Route 111, Aug. 24 – 25

U.S. Route 136 – Pothole patching from Rock Port to Tarkio, Aug. 24 – 26

Route 46 – Pothole patching from U.S. Route 59 to Route EE, Aug. 26 – 28

Holt County

Route T – CLOSED for a slide repair project near Mill Bluff Road, south of Forest City, through August. More info: https://www.modot.org/holt-county-route-t-slide-repair-job

I-29 – Bridge deck replacement project over Route E and Kimsey Creek through mid-September. These bridges are included in Gov. Mike Parson’s $351 million Focus on Bridges program, which will repair or replace 250 bridges across the state. A 16-foot width restriction is in place.

Worth County

Route U – Pothole patching from Route W to the Gentry County line, Aug. 24 – 26