MODOT Construction Week Of August 5th

Nodaway County

Routes B, E and J – Pothole Patching, Aug. 5 – 8

Route A – Bridge maintenance at the Nodaway River Bridge, Aug. 5 – 9

U.S. Route 46 – Pothole patching north of U.S. Route 136 to Route O, Aug. 6

Route O – CLOSED for a culvert replacement from the east city limits of Ravenwood to Orion Road, Aug. 7, 7 a.m. to 3 p.m.

Route B – CLOSED for pavement resurfacing in preparation for wind farm equipment movement in various locations along each route. Aug. 8

Andrew County

Route O – CLOSED at the Platte River Bridge for a bridge replacement project. The bridge will be closed through the end of September. More info: https://www.modot.org/route-o-platte-river-bridge-replacement

Route AA – Pothole patching, Aug. 5

Business U.S. 71 – Resurfacing project from Main Street in Savannah to just south of Interstate 29, Aug. 5 – 9

I-29 – Bridge maintenance northbound on the Nodaway River Bridge, Aug. 5 – 8

Route M – Drainage work, Aug. 6

Route F – Culvert replacement at entrance to County Road 2572, Aug. 6

Route O – Drainage work two miles west of Cosby, Aug. 7

Atchison County

Route CC – CLOSED until further notice due to a damaged culvert under the roadway

Route J – CLOSED at the Tarkio River Bridge for a bridge replacement project through the end of September. More info: https://www.modot.org/atchison-route-j-tarkio-river-bridge-replacement

U.S. Route 136 – Debris removal and shoulder repair from the Missouri River to just west of I-29, Aug. 5 – 12

Gentry County

Route A – CLOSED until further notice at the Grand River bridge due to damage from flooding

Holt County

I-29 – Resurfacing project from the Davis Creek Bridge (mile marker 84) to U.S. Route 59 (mile marker 67), Aug. 5 – 9

U.S. Route 59 – Pothole patching from east of the Oregon city limits to I-29 at Exit 67, Aug. 5 – 9

U.S. Route 159 – Resurfacing project from U.S. Route 59 to Route P near Fortescue, Aug. 5 – 10

Worth County

Route YY – CLOSED until further notice at the Middle Fork of the Grand River after a regularly scheduled inspection revealed critical deterioration to the structure. The bridge is part of Governor Parson’s Focus on Bridges plan and will be included in the September 2019 letting. More info: https://www.modot.org/worth-county-route-yy-bridge-replacement-over-middle-fork-grand-river