MODOT Construction Week Of July 16th

Nodaway County

Route AE – CLOSED for a chip seal project from Route M to Pebble Road, July 16, 7:30 a.m. to 2:30 p.m.

U.S. Route 71 – Guardrail, rumble strips and striping from Route A to just north of Route 48 (Andrew County), July 16 – 20

Route A – Pothole patching from U.S. Route 71 to Route 113 (Holt County), July 16 – 20

Route UU – Driveway culvert replacements, July 16 – 20

Route O – CLOSED for a culvert replacement from Pebble Road to Nodaway Gentry Road, July 19, 8 a.m. – 3 p.m.

Andrew County

Interstate 29 – Bridge deck replacement project at the Nodaway River Bridge. Traffic is head-to-head in the northbound lanes. This traffic pattern will be in place through August and includes a 13-foot width restriction.

U.S. Route 71 – Guardrail, rumble strips and striping from Route 48 to Route A (Nodaway County), July 16 – 20

Route D – CLOSED for a culvert replacement south of County Road 339, July 18, 7:30 a.m. – 3 p.m.

Atchison County

Route CC – Pothole patching, July 16 – 17

U.S. Route 275 – Resurfacing project from the Iowa state line to U.S. Route 136, July 16 – 20

Route B – Pothole patching from U.S. Route 59 to Route F, July 18 – 19

Route F – Pothole patching, July 20

Gentry County

Route V – CLOSED for a chip seal project from Route H to Route AA, July 16 – 17, 7:30 a.m. to 2:30 p.m.

Route V – CLOSED for a chip seal project from Route AA to U.S. Route 169, July 17 – 18, 7:30 a.m. to 2:30 p.m.

Holt County

I-29 – Bridge deck replacement at the Nodaway River Bridge. Traffic is head-to-head in the northbound lanes. This traffic pattern will be in place through August and includes a 13-foot width restriction.

Route A – Pothole patching from Route 113 to U.S. Route 71 (Nodaway County), July 16 – 20