MODOT Construction Week Of August 21st

Nodaway County

Route U – Slide repair from Route N to Keystone Road, Aug. 22

U.S. Route 136 – Chip sealing from the Gentry County line to Route J, Aug. 23 – 24. A pilot car will direct motorists through the work zone. This includes a 12-foot width restriction.

Route N – Culvert and slide repair from Route M to 390th Street, Aug. 23 – 25

Atchison County

Route N – Pothole patching, Aug. 21 – 25

Route EE – Pothole patching, Aug. 22 – 25

U.S. Route 136 – CLOSED at the Little Tarkio Creek for a bridge replacement project. The road will close on Aug. 24 and remain closed until November 2017.

Gentry County

U.S. Route 169 – Resurfacing from Route 31 to Stanberry, Aug. 22 – 26

U.S. Route 136 – Chip sealing from U.S. Route 169 to the Nodaway County line, Aug. 23 – 24. A pilot car will direct motorist through the work zone. This includes a 12-foot width restriction.

Route H – CLOSED for a culvert replacement from Route E to McCurry Grove Road, Aug. 23, 8 a.m. to 2:30 p.m.

Holt County

I-29 – Bridge replacement project at the Davis Creek Bridge near Exit 84, Aug. 22 – 27. I-29 will be narrowed to one lane in each direction. This includes a 12-foot width restriction. The lane closures will remain in place overnight.

Route 118 – The ramp from Route 118 to southbound I-29 CLOSED for the Davis Creek Bridge replacement project tAug. 22 through Nov. 30.

I-29 northbound – Pavement repair at mile marker 81, Aug. 22 – 23

Route B – Bridge maintenance at the bridge over Hickory Creek, Aug. 22 – 25

U.S. Route 59 – Pavement repair just east of the city limits of Oregon, Aug. 24 – 25

Worth County

Route 246 – CLOSED for a bridge replacement project at the Platte River Bridge. The bridge will be closed through September.

Leave a Reply

Your email address will not be published. Required fields are marked *

twenty + thirteen =