MODOT Construction Week Of July 24th

Nodaway County

  • Route J – From Route M to U.S. Route 136 for pothole patching, July 24
  • Route E – From U.S. Route 136 to Route 246 for pothole patching, July 25
  • Route NN – From Route E to the Platte River Bridge for pothole patching, July 26
  • Route EE – From U.S. Route 136 to Route NN for pothole patching, July 27

Andrew County

  • Business Loop 29 (Belt Highway) – From U.S. Route 59 to U.S. Route 169 (Rochester Road, Buchanan County) for a resurfacing project, July 24 – 30. Work will be done between the hours of 8 p.m. to 8 a.m. nightly.

Atchison County

  • Route B – Pothole patching, July 24 – 26
  • Route J – At the Tarkio Creek Bridge for maintenance, July 24 – 27. A temporary traffic signal has been installed to direct traffic through the work zone.
  • Route F – Pothole patching, July 27

Gentry County

  • U.S. Route 169 – From the city limits of Stanberry to Route 31 for a resurfacing project, July 24 – 28

Holt County

  • Route 111 – From the city limits of Forest City to the city limits of Oregon for drainage work, July 24 – 28
  • I-29 – At the Davis Creek Bridge for a bridge replacement project. July 24 – 28. I-29 will be narrowed to one lane in each direction, near Exit 84.

Worth County

  • Route 246 – CLOSED at the Platte River Bridge for a bridge replacement project. The bridge will be closed through September.
  • Route J – Drainage work, July 24 – 25

Leave a Reply

Your email address will not be published. Required fields are marked *

1 × 2 =